North side - 07/21/21

Wednesday 10:00-11:30 am: no newts.
Weather - nice, a bit hot.
Other roadkills: none (the entire road is covered with gravel).
Coverage: from the parking lot to the second stop sign.
Traffic: 9 trucks, 94 cars, 1 motorcycle, 10 bikes, 21 pedestrians, and 20 cars parked by the road and in the parking lots (no cars at the far lot).
County Roads is still repaving the road. The entire north section was under construction, with tar covered with gravel along the entire 2-mile section of the road. Some of it was already like that last week, and long sections were already repaved on the 2020 fall, not sure why they are repaving it again. It seemed that the road being repaved is wider than before, with even narrower shoulders than before. It felt very unsafe (even more than usual) walking on the road in the blind curves. I didn't see the actual construction site.
A link to all my observations of the day -
https://www.inaturalist.org/observations?on=2021-07-21&place_id=any&user_id=merav&verifiable=any

הועלה ב-יולי 21, 2021 08:46 אחה"צ על ידי merav merav

תגובות

לא קיימות הערות בינתיים

הוספת תגובה

כניסה או הרשמה להוספת הערות